Customer Proof
$2.8M annual cloud storage savings at Franciscan Healthcare
32× faster analytics and ETL workflows at Sentara Health
All Customer Stories →
REPORT
Gartner Names Silk in the 2026 Hype Cycle
See Gartner's perspective on the technologies shaping strategic cost management.
Read the Report →

The Teams That Stopped Waiting for the Order That Never Ships

It's the Tuesday before a release, and QA needs one thing: a full, current copy of production to test the last set of changes against. In a normal year, that request gets filled the same day. This year, spinning up a second full environment means opening a capacity ticket, and that ticket gets in line behind every other capacity request in the company, on hardware that's still months out. So the release waits. The next one waits behind it. A year later, the roadmap that was supposed to ship twelve releases has shipped five.

Nobody signed off on that outcome. Nobody wrote it into a plan. It just happened, one delayed ticket at a time, because the hardware a company used to buy its way out of a bottleneck simply stopped showing up.

That's the story playing out across enterprise IT this year. AI has redirected the world's memory and storage manufacturing toward a handful of hyperscale buyers, and everyone else is standing in a much longer line. Server components now carry 40-to-52-week lead times. Memory prices nearly doubled in a single quarter. Enterprise SSD costs rose sixfold in a year. The fix that used to work, buy more, provision more, wait a few weeks, doesn't work anymore.

Here's the part that doesn't make it into the panic: the teams still hitting their numbers this year didn't find a hardware vendor with inventory to spare. They found a way to stop needing the ticket.

The same problem, told three ways

Ask a CIO, an architect, and the person actually running the workload, and they'll each describe this moment differently.

The CIO says: Your capacity plan now depends on a supply chain you can't influence, and the cloud's answer to that is to sell you compute you don't need.

The architect says: Cloud block storage forces you to couple performance to capacity and to instance size, so you over-provision both, and you still hit a ceiling.

Everyone else says: You can't buy the hardware, and renting it wastes a third of what you spend. Silk fixes the second problem so the first one stops mattering.

Three ways of saying the same thing: the constraint moved from the loading dock to the storage layer, and almost nobody has rebuilt their plan around that yet.

The release that shipped anyway

Go back to that QA team waiting on a copy of production. The fix isn't a faster ticket system. It's not needing the ticket at all. With zero-footprint snapshots and thin clones, a team can spin up a multi-terabyte, production-accurate environment in minutes, as many times as it needs, without provisioning new capacity for each copy. The release ships on the Tuesday it was supposed to, because the environment that used to take weeks to build now takes a few clicks. Copy That: How Silk Revolutionizes Dev/Test Efficiency is the fuller version of that story.

The model that made the deadline

A few floors over, a data science team is racing a different clock. Their model needs a fresh, full-scale training set, and the request is stuck behind every other AI initiative competing for the same rationed hardware. A training set that takes three days to assemble is a model that ships three days late, and in AI, three days is sometimes the whole game. Data agility means that team pulls the training set on demand instead of waiting in that line. Powering the Future of AI Workloads covers what that looks like for teams building and retraining models against live data.

The system that couldn't afford to wait

Some teams don't get the luxury of a delayed release. Sentara Healthcare, one of the larger health systems in the country, runs electronic health record workloads where a slow data pipeline isn't an inconvenience, it's a patient care problem. On native cloud storage, performance is capped per disk and per virtual machine, so the only way to go faster is a bigger instance, whether or not the workload needs the compute that comes with it. Sentara moved onto Silk in Azure instead, and cut a core EHR data replication job from hours down to about fifteen minutes, without needing a bigger, more expensive footprint to get there. Silk's Sentara case study and Silk's performance page have the details.

The recovery that took nine minutes

Ransomware and outages don't wait for a calm quarter to happen, and the business's tolerance for downtime doesn't stretch just because hardware is scarce. When recovery depends on point-in-time, zero-footprint snapshots, getting back online is a rollback, not a rebuild. No re-provisioning capacity, no waiting on new hardware to reconstruct an environment from scratch, no hoping the backup vendor has inventory either. Silk Protect's ransomware recovery and resiliency pages walk through what that looks like when the bad day actually arrives.

The customer who signed anyway

For a SaaS provider, the moment a large new customer signs is exactly the moment infrastructure can't afford to be the reason the deal stalls. Standing up a new tenant environment shouldn't require a procurement cycle or a bigger instance tier. When capacity and performance scale independently, a platform provisions what the new tenant needs, when it needs it, and the customer never finds out there was ever a hardware conversation to have. Silk's SaaS solutions page covers how providers are building that into their onboarding motion.

What all five have in common

None of these are stories about a company that found cheaper storage. They're stories about a company whose data stopped needing permission to move. Never Price a Cloud By Its Cover puts a number on what that's worth in dollars, a meaningful share of cloud infrastructure spend, often near a third, goes toward capacity and instance size bought only to buy performance nobody actually asked for. But the dollars were never the point of the story. The point is the release that shipped, the model that made the deadline, the system that kept up, the recovery that took minutes, the customer who signed without ever knowing there was a question about whether the infrastructure could keep up.

 Silk is what makes that possible. It runs as a software layer inside a company's own cloud tenant, on AWS, Azure, and Google Cloud, using the commodity compute and storage the cloud already has on hand, and it separates performance from capacity so neither one holds the other hostage. The hardware shortage doesn't go away. It just stops being the thing standing between a team and the outcome it was hired to deliver.

The order that never ships is still out there, sitting in a queue somewhere with a delivery date nobody believes anymore. The only question is whether your team is still waiting on it. If you want to find out what your own version of these five stories could look like, the team at Silk is hosting a live demo on October 6th, save your spot.

Dave Larson
Written by

Dave Larson is a Solutions Architect at Silk, where he helps enterprises modernize their cloud data infrastructure across AWS, Azure, and Google Cloud. With nearly three decades of experience managing IT organizations and designing and implementing enterprise systems, he brings a practitioner's perspective to conversations about performance, cost, and scale. Dave is a regular presenter on topics like accelerating ETL pipelines with Silk's DB-Aware Snapshots and Thin-Clones, and frequently writes on cloud storage economics and FinOps. He is based in Austin, Texas.